Steel structure contracting companies in Dubai deliver the steel package of a project on site: supply, fabrication and erection of the structural steel under a contract with the developer or the main contractor. From towers and airports to warehouses and villas, the steel contractor builds the structure that the steel structure design defines.
This guide is part of our series on steel structure companies in the UAE and covers top steel structure contracting companies and steel contractors in Dubai and the UAE in 2026, what a steel contract includes, and how real estate developers and consultants appoint a steel contractor.
What a steel structure contracting company does
A steel contractor in Dubai typically takes responsibility for:
- Supply: procurement of steel sections, plates, bolts and coatings to the specification
- Fabrication: in its own workshop or through partner fabricators
- Erection: lifting, aligning, bolting and welding the steel on site, with temporary bracing until the structure is stable
- Site coordination: the erection sequence, cranes, access and interfaces with concrete and facade works
- Documentation: method statements, inspection records and as-built information
Most steel structure contracting companies work as subcontractors to the main contractor, and some contract directly with the developer for the steel package.
Top steel structure contracting companies in Dubai and the UAE
1. Eversendai Engineering
Type: steel structure contracting for high-rise and landmark buildings
Eversendai is known in the UAE for the structural steel and spire of the Burj Khalifa, and it was awarded the structural steel contract for Burj Azizi in Dubai in 2026. It also holds the structural steel works for the Wynn Al Marjan Island resort in Ras Al Khaimah.
Best suited for: steel contracting on super-tall towers and landmark structures.
2. ASSENT Steel (Al Shafar Steel Engineering)
Type: steel supply, fabrication and erection
ASSENT, part of the Al Shafar group, delivers engineering, fabrication, painting, fireproofing and erection of structural steel from its facilities in Dubai.
Best suited for: large commercial, infrastructure and landmark steel packages.
3. Galadari Engineering Works
Type: steel structure contracting
Galadari Engineering Works, part of the Galadari Brothers group, covers procurement, fabrication and erection of structural steel in Dubai, with projects including the Emirates Flight Catering expansion.
Best suited for: commercial and industrial steel buildings in Dubai.
4. Emirates Building Systems (EBS)
Type: supply and erection of steel structures and pre-engineered buildings
Emirates Building Systems, part of Dubai Investments, manufactures, supplies and erects steel structures and pre-engineered buildings. Its contracts include 2,000 tonnes of steel for the Dubai Municipality New Prosecution building.
Best suited for: public, commercial and industrial steel buildings.
5. Mabani Steel
Type: design, supply and erection of pre-engineered and hot-rolled steel buildings
Mabani Steel, part of Al Rajhi Holding Group, designs, fabricates and erects pre-engineered buildings and hot-rolled structural steel from its base in Ras Al Khaimah.
Best suited for: industrial and commercial steel buildings across the UAE and Saudi Arabia.
Steel contractors in Dubai compared
| Company | Role | Typical projects |
|---|---|---|
| Eversendai | Steel contracting | Super-tall towers, landmarks |
| ASSENT Steel | Supply, fabrication and erection | Commercial and infrastructure |
| Galadari Engineering Works | Steel contracting | Commercial and industrial buildings |
| Emirates Building Systems | Supply and erection, PEB | Public, commercial and industrial buildings |
| Mabani Steel | PEB and hot-rolled supply and erection | Industrial buildings, GCC |
Steel structure design before the steel contract
Every steel contract is priced and built from a design. Wrenze Steel Engineering Consultancy carries out the structural steel design of steel buildings, towers and bridges in accordance with AISC 360, ACI 318 and ASCE 7-16 and Dubai Municipality requirements, so the steel package can be tendered against one complete, approved design. Our projects include the G+43 Crown Icon Bay Tower and the Mushrif Park cable-stayed bridge for Dubai Municipality.
Types of steel contracts in Dubai
- Supply and erect: the steel contractor supplies, fabricates and erects the steel to the approved design and shop drawings. The developer keeps control of the design.
- Erect only: the steel is supplied by others and the contractor erects it.
- Design and build: the steel contractor also designs the structure. The design is then tied to one contractor, and prices from other contractors cannot be compared on the same design.
For buildings, towers and bridges, most real estate developers in Dubai appoint the steel structure design first and tender a supply-and-erect contract against it.
How to appoint a steel contractor in Dubai
- Complete the design first. Tender the steel package against an approved structural design with designed connections, so every price covers the same tonnage and details.
- Check similar projects. Ask for completed steel packages of the same type, height and tonnage.
- Check capacity. Workshop output, cranes and erection crews that match the programme.
- Agree the shop drawing process. Who prepares the shop drawings, and how they are checked against the design before fabrication.
- Plan the site. Erection sequence, crane positions, temporary stability and interfaces with the concrete and facade works.
Frequently asked questions
Do steel contractors in Dubai need the design approved before starting?
Yes. The structural design must be approved by Dubai Municipality or the relevant authority before construction, and fabrication should start only from approved shop drawings that follow the approved design. See Dubai Municipality approval for steel structures.
Who is responsible for the connection design, the designer or the steel contractor?
It depends on the contract. Where the connections are designed by the steel structure designer, every contractor prices the same details. Where they are left to the contractor, the connection design must still be checked against the design forces before fabrication.
How is a steel contract priced in Dubai?
Usually per tonne of fabricated and erected steel, with separate items for coatings, fireproofing, bolts and special elements. An optimised design reduces the tonnage every contractor prices.
To prepare the steel structure design for your steel package before tender, contact our engineers.