Dubai Municipality approval consultant for steel structures

Structural submissions for steel structures to Dubai Municipality and the authorities of the other emirates: structural analysis and design report, drawings and comment responses through to approval.

Render of the Esaad administration building for Dubai Police, a steel structure building designed and submitted for authority approval in Dubai

Wrenze Steel is a Dubai Municipality approval consultant for steel structures, preparing structural submissions to Dubai Municipality and the authorities of the other emirates for real estate developers, architects and engineering consultancies. Our engineers carry out the structural analysis and design in accordance with AISC 360, ACI 318 and ASCE 7-16, together with the Dubai Building Code and Dubai Municipality requirements, prepare the submission in the format the authority expects, and respond to every comment through to approval. Our engineers hold Dubai Municipality practice certificates, and the design submitted for approval is the same design the fabricator builds, with no second redesign after approval.

Dubai Municipality approval services for steel structures

  • New steel buildings and multistorey steel structures
  • Building extensions, additional floors and roof structures
  • Mezzanine floors in warehouses, showrooms and offices
  • Warehouses, workshops and PEB buildings
  • Canopies, shades, pergolas and car park structures
  • Pedestrian bridges and link bridges
  • Facade support frames, signage structures and rooftop steel
  • Strengthening of existing structures for new loads, with steel structure assessment

What the structural submission includes

  • Design basis: codes, materials, loads and load combinations
  • Structural analysis and design report: analysis model, member design, stability, serviceability and connection design, presented in a clear, traceable order for the reviewer
  • Design drawings: framing plans, elevations, sections, typical connection details, and base plate and anchorage layouts
  • Foundation interface: support reactions for the foundation design, or the foundation design where it forms part of the scope
  • Existing structure checks: for alterations, the assessment of the existing structure under the new loads

How the approval process runs

  1. Review: we review the architectural drawings, the site and the authority requirements for the project location.
  2. Design: our engineers carry out the structural analysis and design of the steel structure.
  3. Submission: the structural analysis and design report and drawings are prepared and submitted in the authority’s format.
  4. Comments: we review each comment, revise the design or drawings where required, and resubmit.
  5. Approval: the approved design is issued for construction, and our team supports the shop drawing and construction stages.

Authorities across the UAE

  • Dubai: Dubai Municipality, together with free zone and master community authorities such as Trakhees, the Dubai Development Authority and JAFZA where they apply
  • Abu Dhabi: Abu Dhabi Municipality and Al Ain City Municipality
  • Sharjah, Ajman and Ras Al Khaimah: the municipality of each emirate
  • Master developers: the developer’s own design review, where the community requires it

Selected projects

See our structural engineering consultancy and structural steel design services, steel structure design in Dubai, or contact our engineers about your approval.

Dubai Municipality and authority approvals: questions

Which steel structures need Dubai Municipality approval?

New buildings, extensions, additional floors, mezzanines, roof structures, canopies, shades and most permanent steel structures need structural approval before construction. Projects in free zones and master communities follow the relevant authority, such as Trakhees, the Dubai Development Authority or JAFZA, often together with the master developer's own approval.

What does the structural submission include?

The design basis, the structural analysis and design report, design drawings with framing plans, sections and connection details, base plate and anchorage details, and the support reactions for the foundation design, prepared in the format the authority expects.

Do you respond to the authority's comments?

Yes. Our engineers review every comment, revise the structural analysis and design or the drawings where required, and resubmit until the structural design is approved.

Do you handle approvals in other emirates?

Yes. We prepare structural submissions for Abu Dhabi Municipality, Sharjah Municipality, Ajman Municipality and Ras Al Khaimah Municipality, as well as free zone and master developer authorities, following the requirements of each.

Can you take over a submission that has been rejected?

Yes. We review the existing design and the authority's comments, carry out the corrections or redesign required, and resubmit the steel structure for approval.

How do I choose a consultant for Dubai Municipality approval of a steel structure?

Choose a steel design consultant that carries out the structural analysis and design itself, so the submission and the comment responses come from the team that designed the structure. The submission should include the design basis, the structural analysis and design report to AISC 360, ACI 318 and ASCE 7-16 with the Dubai Building Code, and the structural drawings in the format Dubai Municipality expects. To start, we need the architectural drawings, the site details and any authority comments already received.